MICRON TEST AND PROBE
The Micron Test & Probe building was one of five buildings built at the Micron site under an extremely fast track schedule. From day one, our team worked with the design and engineering teams to construct a 195,000 square foot, two level concrete / steel structure in a record time of 9 months.
In addition, a 90 MVA Substation was built by our team to provide power for the entire 1.6 million square foot project. Mid-project our team assumed full management responsibilities for the concrete work. This included a 1,500 foot, three level, poured-in-place concrete utility tunnel.
Our project team was awarded the overall project schedule for the entire project totaling 1.2 billion dollars.
|
|
|
|
|