Ammon Well 8 Tank & Booster Station

Ammon Well 8 Tank & Booster Station

The Ammon Well 8 Tank and Booster Station project consists of the construction of a 1.5 million gallon prestressed concrete reservoir, water booster pump station with 3 vertical turbine pumps, CMU split face block building, 400 kw diesel generator, ductile mechanical piping, ductile iron water lines, site grading, paving, and concrete, chain link fence, and landscaping.
CAPTAIN CLARK ROLLINS