Hilton Well Treatment Facility
Boise, Idaho - Upgrade to the existing Hilton Well facility including the construction of a new 2,000 sq ft masonry building with a water treatment filter system. An 8 foot diameter by 22 foot long filter is placed and mounted inside, mechanical equipment, piping, pumps, pump control equipment, diesel-powered generator, electrical, controls, hypochlorite generation system, storage tanks and greensand treatment system. Constructed to the north of the building is a separate stand alone backwash tank constructed of steel and is 21 feet in diameter and approximately 15 feet tall.