Clif Bar Bakery Plant

McAlvain placed over 13,000 CY of concrete in footings, foundations, slabs and concrete tilt-up for Clif Bar’s new 256,000 sf bakery in Twin Falls, Idaho.  The project includes 108,530 sf of concrete tilt-up and over 256,000 sf of slab on grade that reach thickness up to 24”.  Custom colored concrete tilt-up panels take the shape of snow capped mountain peaks with Clif Bar’s signature logo and suspended climber cast into the concrete.

Accolades:

  • 13,700 CY of Concrete